unfortunately, life has intervened, and I was unable to get any quilting time in my last two days of the challenge :(
Still, I am very pleased with what I was able to accomplish and will continue to try and get some time in on most days. It has definitely helped me understand the type of quilting that I prefer to do - freeform, texture rather than strictly following a plan, so this is a good thing!
I have seen so much wonderful quilting so far, and anticipate seeing a lot more in the coming week!
Showing posts with label Day 13. Show all posts
Showing posts with label Day 13. Show all posts
Friday, May 6, 2011
Day 11, 12, and 13 little at a time!
All most there for me. I have had some internet problems for the last couple of days, so I was not able to post results. Everything is back to normal now. 

I am still working on my daughters graduation quilt. It is about 1/3 of the way done. It is slow going with the pebbling and echoing around the letters and words. I have to go slower than I normally do otherwise I will break a needle if I hit the seam areas the wrong way. That was last Wednesday, day 11 for me.
On Thursday (day12) and today (day 13) I decided to take a break from the quilt and work on some class samples. I had no samples of what FMQ looks like with 100 wt. silk and 50 wt. cotton next to each other.


The smaller picture is the same as the top left corner block area. all four sections of the picture on the right was done with 100 wt. YLI silk on top, embroidery bobbin thread in the bobbin. The batting was 80/20 Fairfield sewn with a 70 Microtel needle. These were a dream to quilt and some of the areas you can see are done on the dense side, and they are very soft to the touch with no stiffness in the fabric and batting.

This last picture shows 100 wt. silk on the left and 50 wt. cotton Gutermann on the right. Though you really can not see much difference in the picture, you can see in real. The 50 wt. thread lays more on the top of the fabric, where the 100 wt. silk melts into the fabric and almost become part of the fabric.
One more day for me and that will make 14 days. Though I tell my students all the time that you have to practice daily to see the results, I am always amazed by the improvements that I make when I quilt on a daily basis. I just wish I had the time to quilt more. But a little thing like work gets in the way. LOL
I am still working on my daughters graduation quilt. It is about 1/3 of the way done. It is slow going with the pebbling and echoing around the letters and words. I have to go slower than I normally do otherwise I will break a needle if I hit the seam areas the wrong way. That was last Wednesday, day 11 for me.
On Thursday (day12) and today (day 13) I decided to take a break from the quilt and work on some class samples. I had no samples of what FMQ looks like with 100 wt. silk and 50 wt. cotton next to each other.
The smaller picture is the same as the top left corner block area. all four sections of the picture on the right was done with 100 wt. YLI silk on top, embroidery bobbin thread in the bobbin. The batting was 80/20 Fairfield sewn with a 70 Microtel needle. These were a dream to quilt and some of the areas you can see are done on the dense side, and they are very soft to the touch with no stiffness in the fabric and batting.
This last picture shows 100 wt. silk on the left and 50 wt. cotton Gutermann on the right. Though you really can not see much difference in the picture, you can see in real. The 50 wt. thread lays more on the top of the fabric, where the 100 wt. silk melts into the fabric and almost become part of the fabric.
One more day for me and that will make 14 days. Though I tell my students all the time that you have to practice daily to see the results, I am always amazed by the improvements that I make when I quilt on a daily basis. I just wish I had the time to quilt more. But a little thing like work gets in the way. LOL
My Last Three Days...
How quickly time moves along!
This was a practice piece for my FMQing Challenge. I did this on my day 12 (Tuesday). I had watched a FMQ video earlier on Tuesday, so as I was practicing, I think I had a better idea of what I was suppose to be doing! On Wednesday and Thursday, my day 13 and 14, I was quilting a mother's day gift...So I'll show just part of it! (I'll post a full view on Monday.)
I also did a small practice piece, but the pictures would not turn out...so the stitching didn't show up. (Sorry there's no picture.)
So, I've finished the FMQing Challenge...and have improved!
However, I may continue to challenge myself for the last week of the challenge as well because now I have a new tool... an extention table for my sewing machine! To see what my loving husband made, visit my blog!
I've Completed the Challenge!
Amanda
I've Completed the Challenge!
Amanda
Subscribe to:
Posts (Atom)
