Wednesday, May 11, 2011
curved feathers
Cheryl M.
myneedleandthread.blogspot.com
Sunday, May 8, 2011
Day 14 for Cheryl
When I started this challenge I was not sure if I could do all 14 days in a row. I am happy to say that a personal goal of doing it, with a little of a challenge to rearrange sewing things. The piecing was little to almost none with the machine set up with FMQ. Wanting a separate machine to just FMQ is more wanted than ever. Day 14 was a busy day but I did manage to squeeze in a 30 minute timeframe of FMQ to do another sample block. This one was inspired by a Joan and Joanne’s samples of feathers and fill stitches. It’s not as good as I would like it to be, but it will do for a sample piece for now.
Thanks for a wonderful challenge Joanne and Wendy. When and if you have another one, I will be happy to join in, this was a fun time.
Cheryl M.
Friday, May 6, 2011
Day 11, 12, and 13 little at a time!
I am still working on my daughters graduation quilt. It is about 1/3 of the way done. It is slow going with the pebbling and echoing around the letters and words. I have to go slower than I normally do otherwise I will break a needle if I hit the seam areas the wrong way. That was last Wednesday, day 11 for me.
On Thursday (day12) and today (day 13) I decided to take a break from the quilt and work on some class samples. I had no samples of what FMQ looks like with 100 wt. silk and 50 wt. cotton next to each other.
The smaller picture is the same as the top left corner block area. all four sections of the picture on the right was done with 100 wt. YLI silk on top, embroidery bobbin thread in the bobbin. The batting was 80/20 Fairfield sewn with a 70 Microtel needle. These were a dream to quilt and some of the areas you can see are done on the dense side, and they are very soft to the touch with no stiffness in the fabric and batting.
This last picture shows 100 wt. silk on the left and 50 wt. cotton Gutermann on the right. Though you really can not see much difference in the picture, you can see in real. The 50 wt. thread lays more on the top of the fabric, where the 100 wt. silk melts into the fabric and almost become part of the fabric.
One more day for me and that will make 14 days. Though I tell my students all the time that you have to practice daily to see the results, I am always amazed by the improvements that I make when I quilt on a daily basis. I just wish I had the time to quilt more. But a little thing like work gets in the way. LOL
Tuesday, May 3, 2011
Day 9 and 10 short to the point.
Cheryl M.
Sunday, May 1, 2011
A long day 8
It has been a long time since I spent most of a day sewing or quilting. I have been in sewing heaven all day. I started out by changing the thread on the machine to water soluble thread to do some trapunto on a geisha panel that I wanted to do, followed by some FMQ fills and accents. All I have left is look for some olive green thread to do a very small section in the lower corner and then I can block this piece and bind it. One done and 3 more to do.
Cheryl M.
Saturday, April 30, 2011
Day 6 and Day 7 from Cheryl
I seem to only be able to grab a 15 –30 minutes time frame each day, but at least it’s something. Thanks Wendy and Joanne for the challenge, it was just what I needed to jump start the FMQ again. Here is what I have been doing for the my day 6 and day 7.
For day 6 I finally figured out the swirl design for my daughter’s quilt. It was staring right at me in one of the fabrics in the quilt.
It’s a feather design with swirly curls for the feathers. I wanted to quilt the red blocks in red and the only red thread that I had left was a spool of invisfil 100 wt. poly.
So I did one small area and it was a dream of a thread to work with, It melted into the fabric and showed very little wobble in the back tracking areas. The small area that is next to the swirl feather is about 1/2” wide by 1” long. The invisfil thread is so fine that you can get very detail in the spacing and control of your movements. If you ever get a chance to work with this thread, do try you will be amazed by the control you can have.
On day 7 I started quilting the red blocks in DD quilt, going slow and that is OK. I mark each 3” block with a pilot frixion pen just enough to see. It might take me the next 7 days to do this quilt, at least I will have been working on it and not folded up in the corner. One thing that I noticed about this design is that every now and then the swirls form a heart shape, fitting for who the quilt is going to.
Cheryl M.
Friday, April 29, 2011
Day 4 and 5 from Cheryl
Cheryl M.
Tuesday, April 26, 2011
Day 3 for Me (Cheryl)
You would think that after 3 years of having a project laying around getting in my way most of the time, you would think that I would have a plan on how I want to quilt my daughters graduation quilt.
But the truth is that all I have come up with to quilt this is to stipple it. I really don’t want something that is simple for something special for her. The photos will not have any quilting on them ( the black out areas) and the words are machine embroidered.
So today I am playing with some fill stitches to hope that something will come to me. If any body has any suggestions please chime in or comment (please, pretty please).
Cheryl M.
Monday, April 25, 2011
Day 2 one FMQ project done :)
I don’t know what the next FMQ project will be, I will look and think about that tomorrow after my guest have left and things get back to normal.
Till later Cheryl
Day 1 for Cheryl
I was planning on starting the FMQ on Friday night or Saturday, but when I got home on Friday. My husband and I had a welcoming surprise from his parents. They decided to drive down from Indiana for a quick visit. So the entire weekend was very enjoyable visiting with them and having my children and grandchildren in and out of the house. It’s a good thing the date was changed, otherwise I would have started out not being able to get all 14 days in.
I did get a few minutes last night around 9 to throw the watercolor piece into a quilt sandwich and start the FMQ on it. I wanted to start out with something that I could just play with thread and check the tension. To feel the machine hum, it had been last September since I did any quilting. It felt so good to be stitch again, even though it was late at night, I did not want to stop.
Sunday, April 24, 2011
Cheryl’s FMQ PLAN:
The first one is a sample that I did for a class that I taught where you use watercolors and paint the picture on fabric. This is somewhat new to me and I like the idea of getting into the artistic side of quilting.
The next project is a fabric panel that I found at one of the LQS that I want to do a quilted wall hanging for my bedroom. Last year I redecorated my room to have an Asian theme to it and the space above the headboard is too small for a regular picture but too large to leave blank. So I will cut these up to four small quilts and hang them next to each other.
The third project is the quilt that I started for my daughter for her graduation; I got the top done the day before she graduated and was not able to quilt it. It’s one of those things that I put off and never get back to it unless I force myself to finish.
Cheryl M.


